1a
Sme Calculator
2 marks

A company manufactures food tins in the shape of cylinders which must have a constant volume of 150 pi cm cubed.  To lessen material costs the company would like to minimise the surface area of the tins.

By first expressing the height h of the tin in terms of its radius r, show that the surface area of the cylinder is given by S equals 2 pi r squared plus fraction numerator 300 pi over denominator r end fraction.

1b
Sme Calculator
4 marks

Use calculus to find the minimum value for the surface area of the tins. Give your answer correct to 2 decimal places.

Did this page help you?

2a
Sme Calculator
2 marks

A right-angled triangle of height h, base r and hypotenuse 15 space cm has been rotated about its vertical axis to form a cone.

q2a-5-5-medium-ib-aa-sl-maths

Write an expression for r in terms of h.

2b
Sme Calculator
3 marks

Show that the volume of the cone, V space cm cubed, can be expressed as:

V equals straight pi over 3 left parenthesis 225 h minus h cubed right parenthesis

2c
Sme Calculator
3 marks

Find the value of h which provides the cone with its maximum volume.

Did this page help you?

3a
Sme Calculator
3 marks

A wire of length 1 m is cut into two pieces. The first piece is bent into the shape of a square. The second piece is bent into a rectangle which has a length l twice as long as its width w. Let x cm be the perimeter of the square.

Find an expression for the area of the square.

3b
Sme Calculator
3 marks

Show that the width of the rectangle w equals fraction numerator 100 minus x over denominator 6 end fraction.

3c
Sme Calculator
3 marks

Find an expression for the sum of the area of the two shapes, S.

3d
Sme Calculator
4 marks

Find the value of x such that the sum of the areas, S, is a minimum.

Did this page help you?

4a
Sme Calculator
2 marks

Liam, a keen runner and swimmer, enters a competition which requires the competitors to run from point A along a straight beach, before diving into the water and swimming directly to point C. Liam is able to run at a speed of 8 m/s along the beach and swim at 2 m/s in the water.

q4a-5-5-medium-ib-aa-sl-maths

Let x represent the distance between A and B,  the distance that Liam runs along the beach before entering the water and swimming along the line BC.

Find an expression for the time taken for Liam to run x metres between A and B.

4b
Sme Calculator
2 marks

Show that the length of B C equals square root of 10000 plus left parenthesis 500 minus x right parenthesis squared end root.

4c
Sme Calculator
2 marks

Find an expression for the total time taken for Liam to finish the race.

4d
Sme Calculator
3 marks

Find the value of x that will allow Liam to complete the race in the quickest time.

Did this page help you?

5a
Sme Calculator
2 marks

A small cylindrical drum, closed at the top but open at the bottom, has a radius r cm and a height h spacecm. The volume of the drum is 1000 space cm cubed.

The material to make the top skin of the drum costs 25 cents per cm squared and the curved surface of the drum costs 20 cents per cm squared.

Find an expression for h in terms of r.

5b
Sme Calculator
4 marks

Show that the total cost of the material to make the drum is C equals 25 pi r squared plus 40000 over r.

5c
Sme Calculator
2 marks

Find fraction numerator d C over denominator d r end fraction.

5d
Sme Calculator
4 marks

The function C open parentheses r close parentheses has a local minimum at the point left parenthesis p comma space q right parenthesis.

Find the value of p.

5e
Sme Calculator
1 mark

State, to the nearest dollar, the minimum cost required to make the drum.

5f
Sme Calculator
4 marks

Find begin inline style fraction numerator d squared C over denominator d r squared end fraction end style and hence, describe the concavity of the function C open parentheses r close parentheses at x equals p.

Did this page help you?

6a
Sme Calculator
1 mark

The daily cost function of a company producing pairs of running shoes is modelled by the cubic function

C left parenthesis x right parenthesis equals 1225 plus 11 x minus 0.009 x squared minus 0.0001 x cubed comma space space space space space space space space 0 less or equal than x less than 160

where x is the number of pairs of running shoes produced and C the cost in USD.

Write down the daily cost to the company if no pairs of running shoes are produced.

6b
Sme Calculator
2 marks

The marginal cost of production is the cost of producing one additional unit. This can be approximated by the gradient of the cost function.

Find an expression for the marginal cost, C to the power of apostrophe left parenthesis x right parenthesis, of producing pairs of running shoes.

6c
Sme Calculator
2 marks

Find the marginal cost of producing

(i)
40 spacepairs of running shoes
(ii)
90 spacepairs of running shoes.
6d
Sme Calculator
3 marks

The optimum level of production is when marginal revenue, R to the power of apostrophe left parenthesis x right parenthesis, equals marginal cost, C to the power of apostrophe left parenthesis x right parenthesis. The marginal revenue, R to the power of apostrophe left parenthesis x right parenthesis, is equal to 4.5.

Find the optimum level of production.

Did this page help you?

7a
Sme Calculator
2 marks

A cyclist riding over a hill can be modelled by the function

h left parenthesis t right parenthesis equals negative 1 over 24 t squared plus 3 t plus 12 comma space space space space space space space space space space 0 less or equal than t less or equal than 70

where h is the cyclist’s altitude above mean sea level, in metres, and t is the elapsed time, in seconds.

Calculate the cyclist’s altitude after a minute.

7b
Sme Calculator
2 marks

Find h to the power of apostrophe left parenthesis t right parenthesis.

7c
Sme Calculator
3 marks

Calculate the cyclist’s maximum altitude and the time it takes to reach this altitude.

Did this page help you?

8a
Sme Calculator
1 mark

A company produces and sells cricket bats. The company’s daily cost, C, in hundreds of Australian dollars (AUD), changes based on the number of cricket bats they produce per day. The daily cost function of the company can be modelled by

C left parenthesis x right parenthesis equals 6 x cubed minus 10 x squared plus 10 x plus 4

where x hundred cricket bats is the number of cricket bats produced on a particular day.

Find the cost to the company for any day zero cricket bats are produced.

8b
Sme Calculator
2 marks

The company’s daily revenue, of AUD, from selling x hundred cricket bats is given by the function R left parenthesis x right parenthesis equals 42 x.

Given that profit = revenue - cost, determine a function for the profit, P left parenthesis x right parenthesis comma in hundreds of AUD from selling x hundred cricket bats.

8c
Sme Calculator
2 marks

Find P to the power of apostrophe left parenthesis x right parenthesis.

8d
Sme Calculator
3 marks

The derivative of P open parentheses x close parentheses gives the marginal profit. The production of bats will reach its profit maximising level when the marginal profit equals zero and P open parentheses x close parentheses is positive.

Find the profit maximising production level and the expected profit.

Did this page help you?

9a
Sme Calculator
2 marks

Dora decides to build a cardboard container for when she goes strawberry picking from a rectangular piece of cardboard, 55 space cm space cross times 28 space cm. She cuts squares with side length x cm from each corner as shown in the diagram below.

 q9a-5-5-medium-ib-aa-sl-maths

Show that the volume, V space cm cubed, of the container is given by

V equals 4 x cubed minus 166 x squared plus 1540 x

9b
Sme Calculator
2 marks

Find begin inline style fraction numerator d V over denominator d x end fraction end style.

9c
Sme Calculator
4 marks

Find

(i)
the value x of that maximises the volume of the container
(ii)
the maximum volume of the container. Give your answer in the form a cross times 10 to the power of k, where 1 less or equal than a less or equal than 10 and k element of straight integer numbers.

Did this page help you?

10a
Sme Calculator
3 marks

A rice farm sells x kg of rice every week.

It is known that  fraction numerator straight d P over denominator straight d x end fraction equals negative 0.02 x plus 6 comma space x greater or equal than 0 comma  where  is the weekly profit, in dollars ($), from the sale of x kg of rice.

Find the amount of rice, in kg, that should be sold each week to maximise the profit.

10b
Sme Calculator
5 marks

The profit from selling 250 spacekg of rice is $480.

Find P left parenthesis x right parenthesis.

Did this page help you?

11a
Sme Calculator
3 marks

A paint company sells x hundred of litres of paint every week.

It is known that  fraction numerator dP over denominator straight d x end fraction equals negative 1.9 x plus 145 comma space x greater or equal than 0 comma  where straight P is the weekly profit, in euros (€), from the sale of x hundred litres of paint.

Find the number of litres that should be sold each week to maximise the profit.

11b
Sme Calculator
5 marks

The profit from selling 7000 space litres of paint is €5000.

Find P left parenthesis x right parenthesis.

Did this page help you?

1a
Sme Calculator
2 marks

An open cylinder with height h and radius r is shown in the diagram below.

q1a-5-5-hard-ib-aa-sl-maths

The sum of the diameter and height for this cylinder is 20 cm.

Write down an equation for the total surface area of the cylinder, A, in terms of r.

1b
Sme Calculator
2 marks

Find begin inline style fraction numerator d A over denominator d r end fraction end style.

1c
Sme Calculator
2 marks

Find the value of r when the surface area is maximised.

Did this page help you?

2a
Sme Calculator
2 marks

The population of rabbits in a colony is modelled over the course of a year by the function

f left parenthesis t right parenthesis equals negative 1 over 8 t cubed plus 11 over 5 t squared plus 20 comma space space 0 less or equal than t less or equal than 12 comma

where t is the time from the start of the year measured in months.

Find the population of rabbits in the colony at t equals 8 .

2b
Sme Calculator
3 marks

Find the maximum population of the colony and the time at which it occurs.

2c
Sme Calculator
2 marks

Find the value of t for which the population of rabbits is increasing most rapidly.

Did this page help you?

3a
Sme Calculator
3 marks

Daphne is starting a business selling fabric via an online retail website. The amount of fabric, in metres, that she thinks she will sell in one month, F, can be modelled by

F equals 151 minus 5 m

where m is the price per metre in US dollars (USD).

Daphne will incur various costs through running her business, both fixed and variable. The fixed costs total $ 89  per month and the variable costs can be expressed by 3m.

Write down an expression for the monthly profit, P, in terms of m.

3b
Sme Calculator
3 marks

Find the price per metre, m, that will give Daphne the maximum monthly profit.

3c
Sme Calculator
3 marks

In her first month of trading, Daphne must not let her costs exceed $128.

Find the greatest profit that Daphne is able to make in the first month.

Did this page help you?

4a
Sme Calculator
2 marks

Patroclus, a would-be Olympic javelin thrower, throws a javelin during a training session.  The height of the javelin’s point can be modelled by the equation

h left parenthesis t right parenthesis equals 1.75 plus 20.2 t minus 4.90 t squared

where t is the time, in seconds, that has passed since the javelin was released, and h left parenthesis t right parenthesis is the height of the javelin above the ground, in metres.

Find h to the power of apostrophe left parenthesis t right parenthesis.

4b
Sme Calculator
6 marks
(i)
Find the stationary point for h left parenthesis t right parenthesis.
(ii)
Justify that the stationary point is a maximum point.
4c
Sme Calculator
1 mark

Find the greatest vertical distance that the javelin’s point travels above the height from which it was released.

Did this page help you?

5a
Sme Calculator
2 marks

A petrol tanker transports fuel in a cylindrical container with length l metres, where l equals 5 r plus 3. The cylindrical container sits on top of a truck bed and cannot exceed its width of 2.6 m.

Show that the volume, V, of the container can be expressed as V left parenthesis l right parenthesis equals space fraction numerator straight pi l stretchy left parenthesis l minus straight 3 stretchy right parenthesis to the power of italic 2 over denominator 25 end fraction .

5b
Sme Calculator
2 marks

State the domain of the function V left parenthesis l right parenthesis .

5c
Sme Calculator
2 marks

Find the maximum volume of the container.

5d
Sme Calculator
3 marks

The transportation company decides to use containers with the length used in part (c). They find that their costs begin mathsize 16px style C left parenthesis x right parenthesis end style, in dollars, vary depending on the size of the order and can be modelled by the function

 C left parenthesis x right parenthesis equals 7 over 8 left parenthesis x minus 5 right parenthesis cubed minus 28 x plus 390

where begin mathsize 16px style x end style is the number of cubic metres of empty space within the container.

d)     Find the percentage to which the container should be filled at which the costs are at a minimum.

Did this page help you?

6a
Sme Calculator
2 marks

Percy has been given a sheet of metal of length 24 cm and width 33 cm. He has been asked to use this material to design an open box that will be used to hold stationery. He removes a square of length x from each corner of the sheet of metal and the remainder of the sides are then folded up to create the box as shown in the diagrams below.

q6a-5-5-hard-ib-aa-sl-maths

Write down the interval for the possible values of x.

6b
Sme Calculator
3 marks

Show that the volume of the box, V, can be expressed as

V left parenthesis x right parenthesis equals 4 x cubed minus 114 x squared plus 792 x

6c
Sme Calculator
2 marks

Find V apostrophe left parenthesis x right parenthesis.

6d
Sme Calculator
2 marks

Using your answer from part (c), find the value of x that maximises the volume of the box.

Did this page help you?

7a
Sme Calculator
1 mark

A chocolate manufacturer wishes to introduce a new chocolate product in the shape of an equilateral triangular prism. The edge of each triangular face has length h cm and the height of the prism is x cm, as shown in the diagram below. The sum of the height of the prism and all three triangular edges is 18 cm.

q7a-5-5-hard-ib-aa-sl-maths

Explain why x not equal to 6 .

7b
Sme Calculator
4 marks

Show that the volume of the triangular prism, V, can be described by

V equals space fraction numerator 3 square root of 3 over denominator 2 end fraction space open parentheses 3 x squared minus 1 half x cubed close parentheses

7c
Sme Calculator
4 marks

By differentiating the equation in part (b), find the length of x for which the volume is a maximum.

7d
Sme Calculator
3 marks

Find the amount of packaging required when the volume of the box is at a maximum.

Did this page help you?

8a
Sme Calculator
3 marks

Check, Mate! is a company that produces luxury chess sets for discerning chess set connoisseurs. The company’s profits P open parentheses x close parentheses, in thousands of UK pounds (£1000), can be modelled by the function

P left parenthesis x right parenthesis equals 0.32 x cubed minus 12.4 x squared plus 150 x minus 480

where x is the number of chess sets (in hundreds) sold per year.  Because of manufacturing constraints, the maximum number of chess sets that the company can sell in a year is 2500.

(i)
State why there is no need to consider values of x greater than 25.
(ii)
Sketch a graph of P left parenthesis x right parenthesis for  0 less or equal than x less or equal than 25.
8b
Sme Calculator
5 marks
(i)
Find the stationary points on the graph, and the numbers of chess sets sold and profits that correspond to those points.
(ii)
Find the maximum profit that the company can make in a year, and the number of chess sets the company must sell to make that profit.
8c
Sme Calculator
5 marks

Calculate

(i)
the average rate of change of P left parenthesis x right parenthesis between x equals 5 and x equals 6.
(ii)
the instantaneous rate of change of P left parenthesis x right parenthesis at x equals 5.

In each case include the units, and explain the meaning of the value you find.

8d
Sme Calculator
3 marks

State the values of x for which the instantaneous rate of change of P left parenthesis x right parenthesis is negative. Explain the meaning of this result.

Did this page help you?

9a
Sme Calculator
4 marks

A manufacturing company is producing tins that must have a capacity of 470 cm cubed. The tins are in the shape of a cylinder with a height of h cm and a base radius of r cm.

Show that the surface area of the cylinder in cm squared, including the two circular ends, may be written as

A equals 2 pi r squared plus 940 over r

9b
Sme Calculator
2 marks

Sketch the graph of  A equals 2 pi r squared plus 940 over r.

9c
Sme Calculator
5 marks

The company would like to minimise the amount of metal used to make the tins.

(i)
Find the stationary point on the graph of A equals 2 pi r squared plus 940 over r,  and justify that it is a minimum point.
(ii)
Hence find the minimum possible surface area for the tin, and the base radius that corresponds to that minimum area.
9d
Sme Calculator
3 marks

A commercially available tin of chopped tomatoes on sale in the UK has a capacity of 470 cm cubed and a base radius of 3.7 cm.

Determine the percentage difference between the surface area of that tin of chopped tomatoes and the minimum possible surface area for a tin with the same capacity.

Did this page help you?

10
Sme Calculator
6 marks

Two numbers, x and y, are such that x greater than y and the difference between the two numbers is 7.

Find the minimum possible value of the product x y, and the values of x and y that correspond to that minimum value.

Did this page help you?

11a
Sme Calculator
6 marks

After analysing several years of company data, a fast food company has determined that the rate of change of its sales figures can be modelled by the equation

fraction numerator d M over denominator d x end fraction equals negative 0.068 x cubed plus 0.72 x squared minus 0.88 x minus 1.9 comma space space space space space space space space space 0 less or equal than x less or equal than 10

where M represents the number of meals sold in a week (in thousands of meals sold), and x represents the amount spent on advertising during the preceding week (in thousands of euros).

It is known as well that 5988 meals are sold in a week where 2000 euros had been spent on advertising during the preceding week.

Find an expression for M left parenthesis x right parenthesis.

11b
Sme Calculator
7 marks

Find the maximum number of meals that the company can expect to sell in a week, and the amount of money that the company should spend on advertising during the preceding week to bring about that level of sales. Give your answers to the nearest meal sold and the nearest euro, respectively.  Be sure to justify that the value you find is indeed a maximum.

Did this page help you?

1a
Sme Calculator
2 marks

A model rocket is released from the ground on a vertical trajectory. The height, h, in metres that it can reach is modelled by

h space equals space fraction numerator 2 m squared over denominator 15 end fraction minus m cubed over 480

where m is the mass of fuel in grams.

Find fraction numerator d h over denominator d m end fraction  and simplify it.

1b
Sme Calculator
5 marks

Using your answer to part (a), find the mass of fuel that is required to reach the maximum height and state what the maximum height is.

Did this page help you?

2a
Sme Calculator
4 marks

An electric scooter travels between two cities at a speed of x kilometres per hour.  Its fuel consumption can be expressed by

y equals square root of 8 x end root plus 25 over x comma  for  x greater than 1

where y is the number of kilowatt hours used.

Find fraction numerator d y over denominator d x end fraction and hence the speed that uses the minimum number of kilowatt hours.

2b
Sme Calculator
2 marks

Calculate the minimum amount of electricity that will be consumed for the journey.

Did this page help you?

3a
Sme Calculator
5 marks

A cone shaped perfume bottle of radius, r, and height, h comma is to have all of its external surface area covered in gold leaf. The bottle is required to hold 95 space cm cubed of perfume, but the designer wishes to minimise the amount of gold leaf required.

Show that the surface area of the bottle can be expressed as

A equals pi r space open parentheses r plus space square root of open parentheses fraction numerator 285 over denominator pi r squared end fraction close parentheses end root squared plus space r squared close parentheses

3b
Sme Calculator
3 marks

Find the radius of the perfume bottle that will result in the minimum surface area and the minimum amount of gold leaf that is required.

Did this page help you?

4a
Sme Calculator
6 marks

A decorative bowl is to be created by casting metal in to the form of a hollow hemisphere, with internal radius r cm and thickness t cm, as shown in the diagram below.

q4a-5-5-very-hard-ib-aa-sl-maths

A design constraint means that r plus 2 t equals 25.

Find the maximum volume of metal that would be required in the construction of the bowl.

4b
Sme Calculator
4 marks

The manufacturer is not happy with the design when the bowl is created using the maximum volume of metal. They claim that, with these dimensions, the volume of metal used in the bowl’s construction is 80% more than the capacity of the bowl.

State whether the manufacturer’s claim is correct. Justify your answer.

Did this page help you?

5a
Sme Calculator
2 marks

A particle P moves along a straight line. The velocity v ms-1 of P after t seconds is given by

v left parenthesis t right parenthesis equals space 1 half space sin space t minus 3 t to the power of space cos space t end exponent plus 8 comma  for   0 less or equal than t less or equal than 10.

The following diagram shows the graph of v.

q5a-5-5-very-hard-ib-aa-sl-maths

Find the initial velocity of P.

5b
Sme Calculator
3 marks

Find the maximum speed attained by P.

5c
Sme Calculator
1 mark

Write down the number of times that the acceleration of P is 0 ms-2.

5d
Sme Calculator
4 marks

Find the acceleration of P when it changes direction the first time.

Did this page help you?

6a
Sme Calculator
5 marks

A newly-commissioned attack submarine is performing a series of manoeuvres to test its propulsion and steering systems.  The vertical position of the submarine relative to sea level (where sea level is represented by h equals 0) is given by the equation

h left parenthesis t right parenthesis equals 0.0125 t cubed minus 1.03 t squared plus 16.6 t minus 165 comma space space space space space space space space space space space 0 less or equal than t less or equal than 60

where t is the time, in minutes, that has passed since the submarine began its manoeuvres, and h left parenthesis t right parenthesis is the vertical position of the submarine in metres.

Find the stationary points for h left parenthesis t right parenthesis.

6b
Sme Calculator
4 marks

For each of the stationary points found in part (a), determine whether the point is a maximum point or a minimum point. Justify your answer in each case.

6c
Sme Calculator
1 mark

Explain why, in order to find the maximum and minimum depths reached by the submarine in the interval 0 less or equal than t less or equal than 60, it is not sufficient merely to consider the stationary points found in part (a).

6d
Sme Calculator
2 marks

Find the greatest vertical distances that the submarine travels in the interval 0 less or equal than t less or equal than 60 above and below the depth from which it started its manoeuvres.

Did this page help you?

7a
Sme Calculator
2 marks

Muggins! is a company that produces luxury cribbage boards for discerning collectors of pub game paraphernalia. For sales of between 0 and 100 cribbage boards in a month, the company’s profits P left parenthesis x right parenthesis, in thousands of UK pounds (£1000), can be modelled by the function

P left parenthesis x right parenthesis equals 4.53 x squared minus 8.51

where x is the number of cribbage boards (in hundreds) sold during the month.  For sales of between 100 and 1000 cribbage boards in a month, the corresponding formula is

P left parenthesis x right parenthesis equals 0.02 x cubed minus 9 over x plus 5

Because of manufacturing constraints, the maximum number of cribbage boards that the company can sell in a month is 1000.

(i)
Confirm that both formulae give the same profit for sales of 100 cribbage boards in a month.
(ii)
State the ranges of x values for which each formula is valid.

7b
Sme Calculator
3 marks

On the same set of axes, sketch the two profit functions. Each function should only be sketched over the interval of x values for which it is valid.

7c
Sme Calculator
4 marks

Show that the combined profit function sketched in part (b) is an increasing function for all valid x values greater than zero.

7d
Sme Calculator
5 marks

Considering only values of x for which P left parenthesis x right parenthesis greater than 0,  find the value of  for which the instantaneous rate of change of P left parenthesis x right parenthesis is a minimum.  Give the value of the corresponding instantaneous rate of change, and explain the meaning of that value in context.

Did this page help you?

8a
Sme Calculator
9 marks

An artist is producing large pieces of sculpture for an art installation. Each piece is in the form of a cylinder with base radius rmetres, on top of which is a hemisphere with the same radius as the cylinder’s base radius. The hemisphere is fitted exactly to the top of the cylinder, so that the circular bottom of the hemisphere lines up exactly with the circular top of the cylinder. 

Every side of each piece of sculpture must be painted, so the artist is eager to find a design for his sculptures such that, for any given volume of a piece of sculpture, the total surface area will be the minimum possible.

Show that for a piece of sculpture with volume k pi space straight m cubed, the minimum surface area occurs when

r equals space cube root of fraction numerator 3 k over denominator 5 end fraction end root

8b
Sme Calculator
2 marks

Find the minimum possible surface area for a piece of sculpture with volume 40 over 3 space pi space straight m cubed. Give your answer as an exact value.

Did this page help you?

9a
Sme Calculator
6 marks

Two numbers, x and y, are such that x greater than y and the difference between the two numbers is k, where k is a positive constant.

Find the minimum possible value of the sum x squared plus 3 y squared, and the values of x and y that correspond to that minimum value. Your answers should be given in terms of k.

9b
Sme Calculator
4 marks

Justify that your answer in part (a) is a minimum value.

Did this page help you?

10a
Sme Calculator
11 marks

Donty is a would-be social media celebrity who is obsessed with the number of ‘likes’ his posts receive. He hires a statistician to study his social media accounts, and after analysing several years of data she determines that the rate of change of his number of ‘likes’ can be modelled by the equation

fraction numerator d L over denominator d x end fraction equals negative 0.164 x cubed plus 2.73 x squared minus 12.7 x plus 15.3 comma space space space space space space space space 0 less or equal than x less or equal than 12

where L represents the number of likes received on a given day (in thousands of likes), and x represents the amount of new video content Donty uploaded on the preceding day (in hours). Because of technical limitations, Donty is unable to upload more than 12 hours of new video content on any given day.

It is known as well that 36075 ‘likes’ are received on a day after 5 hours of video content was uploaded the day before.

Find the maximum and minimum number of ‘likes’ that Donty can expect to receive in a day, and the corresponding number of hours of new video content that Donty should upload on the preceding day to attain that maximum or minimum. Be sure to justify that the values you find are indeed the maximum and minimum possible.

10b
Sme Calculator
4 marks
(i)
For the maximum value determined in part (a), calculate the number of likes that are received for each minute of new video content uploaded the preceding day.
(ii)
State, with a reason, whether the value calculated in part (b) (i) represents the maximum number of ‘likes per minute of new content’ that Donty is able to achieve.